Laserfiche WebLink
. , , � �.. <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> �Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop dowr�spouts to the side sewer. <br /> � Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width_, Depth_, Length_ <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routin� prior to beginning the project. <br /> � 11 I Install erosion control measures as determined by the Publir,Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> ! 13. Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> �� <br /> approved, pertnitted site. No wasting of material is allowed on this building lot. <br /> �15. ,Remove and replace curb, gutter and sidewalk as per Ciry of Everett Standard Pian #'s 305A <br /> J8 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway irom the front property line out to the street pavina. <br /> 18. Contact the Water District for connecting provi�ions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City St��ndard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking ared. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity ilow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements oi NFDA <br /> Standards 13D. <br /> I <br /> PWComments �L I <br />