My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10011 3RD AVE SE BASE FILE 2016-01-01 MF Import
>
Address Records
>
3RD AVE SE
>
10011
>
BASE FILE
>
10011 3RD AVE SE BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 9:32:11 PM
Creation date
3/7/2017 9:31:32 PM
Metadata
Fields
Template:
Address Document
Street Name
3RD AVE SE
Street Number
10011
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � � � on � � . <br /> n' JUN 15 i9QO PUBLIC WORKS DEPARTMENT <br /> UTILZTIES DIVISION <br /> C09T ESTIMATE SHEET ....._...._._......_ 2300 CEDAR STFEET <br /> CITY OF EVERETT EVERETT, WASHINGTON 98201 <br /> Public Wwks Dept. (206) 259-8800 <br /> Receipt $ 3��� Date Paid �'u�i�� <br /> �_ Cost of Work order $ 2050. Work order # <br /> Cost of Service Order $ Service order p <br /> Requested By: Gordon Witcher Date of Request 06/13/90 <br /> Pro,erty Owner (name) D 6 D Investments <br /> Charge Cost to (name if different than owner) <br /> Address mhree Lake Bellevue Dr#100 City Hellevue Zip 98005 <br /> installat:on Location Jrd Ave S E. <br /> Installation type/description/size/etc. EXcavate install tannina <br /> sleeve and valve make hot tap final hook-un and restore area <br /> �A/J The following eetimate Se baeed upon tha Utillties Oivieion provtding all labcr, <br /> equipvent, materlale, [astoration, and final hook-up. <br /> � j The folloving estimate is baaed upon the Street Divieion wo[k group providing all <br /> labor, equipment, materiale and restora[ion to property. <br /> Mhenever the eetimated coe[ La not eufticient to tover the total expenee for laboc, <br /> material, equlpment rental and adminietrative coeter the deficit ehall 6e charged to <br /> the property for whlch auch inetallation wae made and [he owner ehereof, and provided <br /> furt5er, that any exceas payment ahall be returned to the pereon applying for the <br /> ina:allation. <br /> IteIDized Cost Estimate: <br /> La6or & Overhead 675. cc: susy xaugen <br /> clair Olivera <br /> Material 965. _ Tom xhetford <br /> Don Weitkamp <br /> Equipment Rental 360. xirk erooke <br /> Gordon Nitcher <br /> Surface Restoration 50. o. oon wahl <br /> service order cost �_ <br /> Total 2.050. <br /> Prepared by O. D. Wahl �� <br /> Revised e2/22/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.