My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11004 3RD AVE SE 2016-01-01 MF Import
>
Address Records
>
3RD AVE SE
>
11004
>
11004 3RD AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 9:53:26 PM
Creation date
3/7/2017 9:53:23 PM
Metadata
Fields
Template:
Address Document
Street Name
3RD AVE SE
Street Number
11004
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ <br /> CLOSED CM WORK ORDEPS REPORT <br /> Total Utility Maintenance Mariagement System page 1 <br /> 06/29/1995 <br /> Date Range : O1/09/1989 - OG/26/1995 <br /> CM Work Order Range : 1001091070001 - UT2G08- ' Pattern :*101196750262 <br /> Item Range :<Blank> - WW22020001 <br /> Program ALL Function ALL Activity ALL <br /> CM WORK ORC�R ID: 710119G7502G2 Title: CONVERT 11004 3RD AVE SE <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS2484R002 -- WATER SERVICE <br /> Location ID: -- Activity 675 <br /> Program 710 Function 119 <br /> Date Completed: 06/22/1995 <br /> overall Craft: <br /> Issued: 06/22/1995 Issued by: WMW Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: planned Hrs Actual Hrs Cost <br /> Craft ID Name ---------- <br /> ----------- <br /> ---------- <br /> ----- ------ ------------------------------ 1. 00 15.03 <br /> 0.00 <br /> UL SSJ SMITH, STEVE J. p,00 1. 00 20.08 <br /> WST WDT WALDEN, DAROLD T. ___------- <br /> ToL�l Labor Cost: 35. 11 <br /> Materials: Date T Used Cost <br /> ip Description _______i ---------- <br /> ---- -------- <br /> ------------ <br /> -------------------------- 30.99 <br /> METE36089447 METER 5/8" X 3/4" NEPTUNE T-10 OG/26/199 __________ <br /> Total Material Cost: 30.93 <br /> Vehicles: nours Cost <br /> ip Description __________ <br /> ----- ------ <br /> -- -- ------- <br /> -------------- 5.60 <br /> ------------ 1. 00 <br /> V2117 91 CHEV 1-TON HYD UNIT __________ <br /> Total Vehicle Cost: 5.60 <br /> Work Description: ------"' <br /> ---------------------------------------- <br /> MET�R# 40635671 <br /> -----71.70 <br /> Tot�l cost for work order 7101196750262: <br />
The URL can be used to link to this page
Your browser does not support the video tag.