Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> � Connect rnoftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runo(f must be ci���harged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br /> altachment for more details. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior lo beginning the project. <br /> 11. Install erosion control me2sures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12 Install erosion control measures per City of Everett Standards for small parcels <br /> 13. Remove erosion conlrol measures upon complelion o(the project prior to finai approval of the <br /> permit. <br /> 14. All excavated malerial from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted sile. No wasting of ma�Eriai is allov;ed on this building lot. <br /> 15. Remove and replace curb, gutter and side�ti�alk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by tlie Public Works Inspector(i.e. all unused <br /> driveways and any brol<en or damaged area must be replaced). <br /> 16. Install a Type I concrele driveway per City of Everelt Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Slandard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be inatalled, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> FN'Comr.ents � <br /> L <br />