My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8808 3RD AVE SE 2018-01-01 MF Import
>
Address Records
>
3RD AVE SE
>
8808
>
8808 3RD AVE SE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 7:50:01 AM
Creation date
3/7/2017 10:32:52 PM
Metadata
Fields
Template:
Address Document
Street Name
3RD AVE SE
Street Number
8808
Notes
SITE DEVELOPMENT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> '� 4.�� Connect side sewer per City Standard #601. <br /> ,\ / <br /> 5. Connecl side sewer per City Standard #'s C01, 602, R04. <br /> 6. Connecl all rooftop do�vnspouts to the side sewer. <br /> l 7..� Connect roo(lop downspouls to lhe drainage syslem provided for this lot. <br /> 8. Rooitop runo(f musl be discharged to a roof downspout in(iltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size lrench is 3.5'wide, 2'deep and 25' long. See attacliment for <br /> more details. <br /> 9. The contraclor must meet with lhe Public Works Inspecfor to discuss potential drainage routing prior to <br /> bec�inning the project. <br /> 10. Install erosion control measures as delermined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion conlrol mzasures upon complelion o(the project prior to final approval of lhE permit. <br /> 13. All excavaled material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permilted site. No wasling of material is allowed on lhis building lot. <br /> � 14� Nu drt, mud, rocks or de�ris to be tracked onto roadway. <br /> 15. No building materials to be slacked on sidewalks and side�valks to be kept clean and open tor <br /> pedeslrian travel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gultei and sidewalk as per City o(Everett Standard Plan #'s 305A& 306 on <br /> this proposaPs frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area musl be replaced). <br /> 10. Inslall a Type I concrete driveway per Cily of Everett Standard #307. <br /> 19. Pave driveway from lhe front property line oul to lhe slreet paving. <br /> 20. Conlacl lhe Waler District(or connecling provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per Cify Standard Plan�402 wilh a gas trap p=r Standard Plan#410 is required (or lhe <br /> parkinc�area. <br /> 22. I(a sewer pump syslem is lo be installed, lhe pressure line musl discharge into a private manhole, then <br /> gravity Oow across the public righl-of-way. <br /> 23. A sprinkler system is required for this buildinc� in compliance with the requirements of NFDA Standards <br /> 13D. <br /> FOR PUBLIC INORKS INSPECTION, CALL f2ANDY AT 425339-74031 CLIFF AT 425339-7404 <br /> I <br /> r <br /> P1;Ccn��mcras <br /> ���� <br />
The URL can be used to link to this page
Your browser does not support the video tag.