Laserfiche WebLink
' J. CL1, �K JOHNSON ENGINEERS, P.S.1 JC. <br /> � '14`8- 1'12th AVIIJUE h.E. <br /> BELLEVUE, WA 980D4 <br /> (425)454-7137 <br /> FAX I425)837-29<9 <br /> Emnil: jahnaonanpmeol.com <br /> September I0, 1998 <br /> Everett Public Works-Permit Services <br /> City of Everett ` <br /> Attn:Tony Lee <br /> • <br /> Re: Plan Review for Proposed 3rd Avenue Apaziments <br /> Project#B 59552 <br /> Mr. Lee, <br /> Our response to the structural portion of your plan review for the above refcrenced project is as <br /> follows: <br /> Swctural <br /> l. See response by architect. <br /> 2. See revised shcanvall schedule on sheet S3. Note#6 haz been added to include the use of <br /> 2"x 2"x 3/16"thick plate washers. <br /> 3. See revised details 3, 8 and 9 on sheet S2. A34 clips have been used to transfer the shear <br /> instead of 16d toenails. Toenails are still shown on details 6 and 7 on sheet S2 since the rim <br /> joist and double top plate are continuous for the entire length of the wall. <br /> :f you have any questions or concerns regarding our rcsponse,please give us a call. 9 �` �-' <br /> Sin relyYours, ��(��'�'��,����y <br /> � g <br /> i'� Q <br /> �Q�F,�A�� ��4. <br /> � �OMALE �` <br /> ).Clark Johnson, P.E. 8 �1 <br /> ��� 1U-22- <br /> � <br /> y <br />