Laserfiche WebLink
February 24, 2003 <br /> Kirk Brooks <br /> City of Everett <br /> Public Works <br /> 3200 Cedaz Avenue <br /> Everett, WA 98201 <br /> Dear Mr. Brooks, <br /> We agree to complete items summarized below(w/estimated cost)by August 24, 2003. <br /> 1) Remove and replace driveway approach and gutter($1,450) <br /> 2) Saw cut asphalt at driveway entrance and replace($450) <br /> 3) Adjust water meter boxes to grade ($50) <br /> 4) Install improvised floatable materials separator as per Keith (�500) <br /> The estimates for the above items total 52450. We have reserved $4200 to account for <br /> any potential contingency. We have executed the attached Assignntent of Funds to City <br /> of Everett, and reaffirm our understanding of the terms. <br /> Sincerely, ���,V� <br /> � <br /> ✓' � <br /> Eric Jacobsen <br /> Jacobsen Homes—General Contractor <br /> E & A Enterprises—Owner <br /> 425-330-0444 <br /> �L.l� <br />