My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9417 3RD AVE SE 2018-01-01 MF Import
>
Address Records
>
3RD AVE SE
>
9417
>
9417 3RD AVE SE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2018 9:46:49 AM
Creation date
3/7/2017 10:49:14 PM
Metadata
Fields
Template:
Address Document
Street Name
3RD AVE SE
Street Number
9417
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.• . __. � � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> lf, �Connect side sewer per City Standard #'s 601, 602, 604. <br /> � � 2. Connect all rooftop downspouts to the side sewer. <br /> (��!�Connect rooftop downspouts to the drainage system provided for this lot. <br /> �), 4. 7he contractor must meet with the Public Works Inspector to discuss a storm water system prior to <br /> beginning the project. Call Randy Allen at 425•339-7403/Call Cliff Lindman at 425-339-7404. <br /> g, 5. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> �. 6. Install erosior�control measures per City oi Everett Standards for small parcels <br /> �0 7. Remove erosion control measures upon complelion of the project prior to final approval of the permit. <br /> ��. �All excavated material irom foundation, sidewalk and driveways shall be hauled to an approved, <br /> permided site. No wasting ot material is allowed on this building lot. <br /> I2 9. No dirt, mud, rock�or debris to be tracked onto roadway. <br /> 13 10. o building materials to be stacked on sidewalk/roadway and sidewalklroadway lo be kept clean and <br /> open for pedestrian travel. <br /> �11 11. Adjust water meter box 1"above sidewalk grade. <br /> � <br /> 12. Remove and replace curb, gutter and sidewalk as per Cily of Everett Standard Plan #'s 3Q5A& 306 on <br /> lhis oroposal's trontage as directed by [he Public Works Inspector (i,e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 13. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 14. Pave driveway trom the front propeRy line out to lhe street paving. <br /> 15. Pave to existing paving in alley. <br /> 16. Contact the Water District for connecting provisions for this building's water and <br /> sewerservices. <br /> 17. A catch basin as per City Standard Plan iJ402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 18 If a sewer pump system is to be installed, lhe pressure line musl discharge into a privale manhole, then <br /> gravity flow across the public right-of-way. <br /> 19. A sprinkler system is required for lhis building in compliance with the requiremenls oi NFPA Standards <br /> 13D <br /> Your Public Works Inspeclor is Cliff Lindman. Call 425339-7404 tor any questions andlor inspections. <br /> Your Public Works Inspector is Randy Allen. Call 425-339-7403 for any questions and/or inspections. <br /> FENCE <br /> #. In the event that the City needs to access the right of way, it will be the owner's respons�bility to remove the <br /> fence at their expense. <br /> PWCanmenls I Revisetl t?f112013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.