Laserfiche WebLink
� <br /> �..��wnnc+s+-a�t-mr-zvr"R���T,�`.t�o�a��.��kt:-h — - <br /> „r, t,–�,�,�.,�pc --- w- — <br /> 1M <br /> I <br /> . I <br /> r I <br /> npril 15, 1980 � <br /> tce E:.,rgrce. <br /> CITV OF <br /> Art Dujardin, Vice-President everett <br /> Dujardin Development Company <br /> 9623-32nd S.E. an we��• aao•evv <br /> Everett� W8 98201 avencn, w�awmcron <br /> •saoi . <br /> Dear Art: <br /> This letter is to document the City's approval of the Final Clearing plan for <br /> your PRD located north of south Broadway and west of 3rd Avenue. This approval <br /> is based on the final clearing plan submitted to the City 4/15/BQ. The approval <br /> allows the clearing of all roadways, parking areas and building sztes. There <br /> will be additional clearing permitted outside of these areas only if the trees <br /> have lieen mdrked by your staff for removal with approval of the Planning Depart- <br /> ment. <br /> A grading plan must be prepared prior to any substantial movemerit of soil on <br /> • the site. The clearing approval does not ad�lress i�sel.f to any gradin9 on <br /> site and therefoze none is permitted. This document will be zeviewed by botli <br /> the Planning and Public Works Departments to insure compliance with the clearing <br /> plan and the erosion control plan. <br /> The P.�blic Works Department reviewed the temporary erosion controi plan. for <br /> the project and placed one condition on the approval of that plan, th�t being <br /> all temporary sedimentation ponds must be setback from the North Creek stream <br /> corridor. . <br /> IF you have any questions,about this final clearing plan approval, please <br /> contact me at 259-873 L <br /> Sincerely, <br /> y[� ' <br /> ��✓�''�v/J�' Ll�L1J--� <br /> Gerry Er41ne . <br /> Ylanner <br /> GE;nr <br />