My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 3RD DR W 2018-01-02 MF Import
>
Address Records
>
3RD DR W
>
5901
>
5901 3RD DR W 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2021 1:08:18 PM
Creation date
3/7/2017 11:06:33 PM
Metadata
Fields
Template:
Address Document
Street Name
3RD DR W
Street Number
5901
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gco Engincers <br />Select Homes <br />237 Elm Street <br />Everett, Washington 98203 <br />Attention: Mr. Randy Clark <br />I)I1 <br />APR _.,J <br />April 19, 1993 <br />CIT'! OF EVERE <br />Pnbhe Works (),,pt. GeomImnmenral and <br />Gmlogic Services <br />Building Setback Conditions <br />Hanabrook Development <br />Divisions III and IV <br />Everett, Washington <br />File No. 2670-005-1106 <br />The purpose of this letter is to cudine reduced building setback conditions for location of <br />homes at the tops of sloi.es on Divisions III and IV of the Hanabrook Development in Everett, <br />Washington. This has bo-.n discussed with Mr. Randy Clark of Select Homes, Mr. Fat McCourt <br />of Universal Brokerage Corporat'.on, aad Mr. Michael Crowson of W&H Pacific. <br />We have observe I : - sign; of i.istability on native slopes in Divisions III and IV. Fill <br />slopes on Divisions III a:d IV were : jmtructed with structural fill consisting of on -site granular <br />soils under full-time mouitorim, - if a qualified individual from our firm. The structural fill is <br />keyed into existing rim natb a soils and fill placed to achieve the final slope grades has been <br />properly hinched into existing native materials and compacted to 95 percent of MDD (maximum <br />dry density) according to the specifications of the ASTM D-1557 test procedure. In 216uition, the <br />lots are graded to slope away from the tops of slopes and all slopes have been covered with jute <br />malting at.d hydroseetel for erosion protection. <br />In our opinion, where slopes have been placed, compacted, graded, and vegetated as <br />described above, the minimum building setback distance can be reduced to 10 feet. The setback <br />distance is the horizontal distance measured from the front face of die footing to the face of the <br />slope. It should be understood that if the setback distance is reduced to 10 feet, the risks of <br />losing access, reducing the design life of the foundations and having slope movement impact the <br />house foundations are increased. <br />rkeEnglnm Inc. <br />8,110 151th Mime N.E. <br />Re niand,irk 9805E <br />ltkphme(206)86laW <br />Fix,.-M)86146050 <br />
The URL can be used to link to this page
Your browser does not support the video tag.