My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5926 3RD DR W 2016-01-01 MF Import
>
Address Records
>
3RD DR W
>
5926
>
5926 3RD DR W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 3:52:48 PM
Creation date
3/7/2017 11:09:15 PM
Metadata
Fields
Template:
Address Document
Street Name
3RD DR W
Street Number
5926
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( <br />Bill & Jennifer Rinehart <br />5926 Tlurd drive West <br />Everett, WA 98203 <br />425-347-6679 <br />The house at 5926 'I'hird Drive West was built in 1993 by Select Homes. The floor plan is <br />a mid entry split Itvel. The upper levd consists of three bedrooms, two full baths, living <br />room, dinning roori an�i kitchen. The home was purchased with an "unfinished" basement, <br />consisting of a family room, bedroom, and L.eandry/bath room, all in a rough finish state. <br />The goal of the project is to complete the badroom snd family room in accordance with all <br />currmt codes and :iave a"Legal" bedroom and "Legal" family room. The Bath/Laundry <br />room is to be completed at a fi�turo date. <br />Step one is to install recessed lighting in place of the lighting supplied by Select, and also <br />add additionel outlets. <br />Step two is to finish the framing oEtt�e bedroom to include a closet, and also frame around <br />the e�dsting heating ducts. In addit:on, a door will be framed betwcen the family room and <br />the bedroom. A closed door will be framed to allow access to storage space below the <br />stair well. <br />Step three is to insulate the ceiling and interiar walls. <br />Step four is to drywall the family room and bedroom. 5/8" fire stop will bc used for the <br />ceiling, and 1/2" will be used for the walls. <br />Step five is to tape, texture znd paint the dry wall. <br />Step six is to finish the trim work and install the doors. <br />Step seven is to obtain final certificate of occupancy on the finished roorr:;. <br />0����� <br />�u� 2 s t99g . <br />CI'T':' OF I;VfRi.'!'�. <br />�'crmit icrvicCc <br />
The URL can be used to link to this page
Your browser does not support the video tag.