Laserfiche WebLink
PEAK ENGINEERING <br />June 15, 2000 <br />City of Everett <br />Public Works <br />Attn: Paul McKee <br />3200 Cedar St <br />Everett, WA 98201 <br />RE: South Pointe Assisted Living Center <br />PW 000�-021 <br />Mr. McKee <br />%r,' <br />� <br />1 <br />� <br />In responsc to your fax transmission dated June 8, 2000, the following comments were <br />addressed: <br />I. The open water cell of the detention pond has been increased to three feet. <br />2. A planting plan for the water qualiry cell of the detention pond has been prescribed. <br />3. Per discussions with yourself and Advanced Fire Protection, the water services as shown on <br />the original plans were not changed. <br />4. The general notes on sheet one specify that unless othenvise noted, all catch basins are to <br />comply with C.O.E. E.D.D.S. Standard Plan A-102. The catch basin callouts have been <br />changed to reflect "Type A" CB's as opposed to "Type 1" CB's. <br />5. Per your recommendation, the wheel stops in the parking stalls have been removed and a six <br />inch raised curb is being used. <br />[f you have any questions or cc�mments, please don't hesitate to call. <br />Sincerely, <br />`( � l.� <br />Russell C. Reed, E.LT. <br />J: � RI:1'ORTS—�99I78`COEamm-Itr.doc <br />P.O. 8ox 957 • 1720 Grove Street • Marysville, WA 98270 <br />PHONE (360) 658-6986 • FAX (360) 658-7826 • E-MAIL �eakengCa�gle.net <br />