Laserfiche WebLink
DONT R. KIRICMAN - ARCHIT�CT <br />PO.BO%816•AUBURN.WASHINGTON 90077�0916•1253)833-7910•FAX(253�B3Y7915 <br />September 5, 2000 <br />State of Washington <br />DEPARTMENT OF HEALTH <br />Facflities & Serv(ces Licensfng <br />Construction Review Services <br />Post Office Box 47E352 <br />Olympia, WA 98504-7852 <br />Phone: (360) 705-6778 <br />STATE OF W�H�NGTON <br />DEPAR PP O�p �`LTH <br />OCT 3 - �00� <br />�Li�IS },1►� <br />SUA p APP� CABLE REGU ATIONER <br />A'ITN.: Richard M. Swanson (Architecturel Plans Revlew) <br />John R. Templar, R.S. (Publfc Heal:h Advisor, DBA: Sanitarian Review) <br />Wiliiam M. Kingrey, PE (Mecharical/Electricai Review) <br />Chad E. Beebe, CSI (Fire and Life Safety Revfew) <br />RE: South Pointe Assisted Living Residence Addition <br />CRS Project Number: 00-08128-5810-003 <br />ARCHITECTURAL PLANS REVIEW COMMENTS <br />Richard M. Swanson 8/29/2000 <br />Phone: (360)705-6782 Fax: (360)705-6654 <br />1. Make revisions as requlred to coordinate the functfonal program and construction <br />drawings. The number of residents seems to differ in different locations and there is <br />a difference in the common rooms prov(ded. WAC 388-78A-070(2)(c)&(e) <br />Response: Accepted. <br />2. Provide a door hardware schedule. WAC 388-78A-070(2)(e)(ii)(D) <br />Provide a revised Sheet A3.01 tying the door hardware schedule to the door <br />schedule. WAC 388-78A-070(2)(e)(ii)(D) <br />Response: Please see attached door hardware schedule. <br />4. <br />Response: See revised door schedule Sheet A3.01 <br />Verify that all the units includ(ng the one-bedroom unit will be occupied by a single <br />resident. WAC 388-78A-150(1)(a)-(e) <br />Response: Accepted. <br />Identify and show where a lockable storage space will be provided if requestzd by s <br />resident. Placing a lock on the bathroom door and entry door does not sa:isfy thi, <br />requiremen[. WAC 388-78A-150(1)(m) <br />Response: Please see sheet A6.01 for locations of tockable storaQe areas. <br />Changes have been clouded and labeled Rev. 2. RECEIVED <br />� • SEP 0 7 2000 <br />�'1 � ._ ". " � �Q �5 $ �, o "� �O � CONSTRUCTION REVIh:1 <br />�.+� u � <br />