Laserfiche WebLink
ua�lu:ud o9:17 F.aS lsn�2:1207; LRS .�RCHITECTS, I�C. __ _ � oo:�nu: <br />South Pointe ALF Remodel <br />F�om: <br />Farmington Conters <br />5100 SW Macadarti, Sui[e 36U <br />Portland, Oregor 97239 <br />(503)595-2810/F(503)595-281B <br />RFI rtl_,_. e� <br />RFI Description. <br />RFI No,: Ob <br />Date: March 16, 2004 <br />To: <br />LRS Archifects, Inc, <br />1121 SW Salmon Street, #100 <br />Portland, OR 97205 <br />(503) 221-1121 /F (503) 221-2077 <br />1. Request (urther clanCcation o( A-35 clips (see ASI #1). <br />Response: Tlie A-35 transfer clips are required at ihe lype 7 and type 2 shear <br />walls as indicated in fhe Shear Wall schedule on sheet S1.1. The fasteners are <br />required at least within the lengths of the arrows of the shear walf type on the <br />plan. Note Inat the type 2 shear wall has spacing o( 12" o.c.. <br />2, Truss r.lippin,q of every Wss with N2.5 as directed by Building Inspector. <br />Rosponse: Refer to sheet 52.1, Detail C1. Roof Truss �nd Defail. 7he structur.�l <br />documents show that an N2 fastenor at each fruss is adequate lor the <br />�:onneclion �; the truss fo the wall system. <br />Also note thatthe fasteners are prelerred to be locetod on the exterior (�ce o( <br />the flaming, prior to pl}�vood installafion. A conversation with the st�uctural <br />engineer did clan(y thaf installation on the interior (ace, while not preferred, is <br />accepiable <br />Requested by /ton ZiebaA, Farmington Centers (by telephone) and �;so discussed <br />di�ectly �vilh Jcf� Koon, Cont�actor <br />qn,wered by: �-RS Aichitects, Inc. <br />Signr�fir/�LG�--� <br />py; D�inie� �L Ed�vards <br />