Laserfiche WebLink
� <br />PUBLIC WORKS PERNlIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />6. Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />��Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof dovrr�spout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth __, Length _ <br />10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the r3rking area. <br />11. Remove anc; replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replacedj. <br />12. Install a Type I concrete driveway per City of Everett Standard #307. <br />13. Pave driveway from the front property line out to the street paving. <br />i <br />14;,Contact the b/jlal�I�Y3-c� _ Water District for connecting provisions for this building's <br />water and sewer seroices. <br />15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />16. The contractor must meet with the Public Works inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standarjs 13D. <br />PWCanments �-IL <br />l <br />