My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8923 4TH AVE W 2016-01-01 MF Import
>
Address Records
>
4TH AVE W
>
8923
>
8923 4TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 11:25:10 AM
Creation date
3/7/2017 11:32:48 PM
Metadata
Fields
Template:
Address Document
Street Name
4TH AVE W
Street Number
8923
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />6. Con�ect side sewer per Ciry Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />// B'./ Connect rooftop downspouts to the drainage system provided for this iot. <br />�l/ <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length .__ <br />10. A catch basin as per Ciry Standard Plan #402 with a gas trap oer Standard Plan #410 is <br />required for �he parking area. <br />t t. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan k's 305A <br />8� 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard N307. <br />13. Pave driveway from the f•ont property line out to the street paving. <br />�14 Contact the �� e-�'l Water District for connecting provisions for this building's <br />water and sewer services. <br />15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity tlow across the public right-of-way. <br />16. The ccntractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is required for this buiidi�g in compliance with the requirements of NFDA <br />Standards 13D. . <br />r� ���� ��c�v�.-rG� r-�,�lz---� ��� Fzn�,.� r-o��tio.onc,� <br />` rn�� L�3 E H� l.� l, t��� % o %� �-� <br />S t OC�LC�G}Cr(�� C�L�1 L��c`-�zz' `' ' %�/fx <br />�� .-, ri2i7•.%7�J 'S � /v'� .u�f-5�c�•UC� CF/%%�iL <br />f1'/�! .ZG1. cJ � � � � � � � <br />'/ � <br />C �l -t�u r�UILl�iUl� �c.'� � , <br />PWWmmems <br />
The URL can be used to link to this page
Your browser does not support the video tag.