My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9203 4TH AVE W 2016-01-01 MF Import
>
Address Records
>
4TH AVE W
>
9203
>
9203 4TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 11:13:11 AM
Creation date
3/7/2017 11:37:00 PM
Metadata
Fields
Template:
Address Document
Street Name
4TH AVE W
Street Number
9203
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MMC <br />CE SE <br />December 12, 201 1 <br />MMC Enginecring, Inc. <br />Cll'/L fi STRUCTL/RAL ENGLVEERlNG <br />»�cn.�r_i r..�icc:i,v,v s.r. <br />\1'A. CO <br />To: Jason Lalone <br />Johnson 1-lomes and I'roperties <br />Subjcct: Holes for Plumbing in Wood Joists �- <br />New Residenti:�l Construction <br />9203 4th Ave. W. <br />G��crett, WA 98204 <br />Jason: <br />r:,e�� - av„' na. s. e. <br />ei'E2ci�: i�:a. vs>os-y��i <br />OhF7('F.: la?5) 8'9--9�19 <br />Fnruil: msqunredaRiiralinrtcnrn <br />�,����t c�; �,;� � <br />As you requested, the existing residence tmder construction �vas inspected by <br />Michacl P. McCann of MMC �ngincering on December 8, 2011. 1'he purpose <br />was to determine the level of structural damage, if any, to three wood joists due <br />to plumbing penetrations, and recommend any remedial mcasums needed. Mr. <br />McCann is.a licensed SU•uctural Gngineer in Uie State of Washington and <br />initially only provided thc latcral dcsign for this residence. <br />The structure currently under consU•uction is a two story wood frame. Thc <br />holes found wcre drilled in three joists over the garage toward the back wall of <br />the garage. Pictures wcre taken of the condition, but not included in tliis <br />reporL The span of the_joists was 9'-7" clear fi•om the outside wall to the <br />interior glulam bcam, with the centerline of the drilled holes 2'-9" from the <br />edge of the Slulam beam. The holes drilled �vere about 4" in diameter, �vith the <br />bottom of Qic hole varying from 1" to 1?5" fi•om thc bottont of Uie joists. The <br />2X l0 joists �vere a mix of # 1 and #2 HF inaterial. <br />Prom the attached calculations, the moment capacity of the three joists has been <br />reduced significantly as h�s been the shear capacity. Although the remainins <br />shear capacity is still OK, the moment is not. Consequently, one LSTA36 _ <br />necds to bc nailed to the underside of each joist with (24) lOd nails, with <br />the straps centercd on thc holes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.