My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9217 4TH AVE W 2016-01-01 MF Import
>
Address Records
>
4TH AVE W
>
9217
>
9217 4TH AVE W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 11:09:31 AM
Creation date
3/7/2017 11:38:14 PM
Metadata
Fields
Template:
Address Document
Street Name
4TH AVE W
Street Number
9217
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COPJIMENTS <br />4. As per Public Works approved plan dated <br />5. Conneot side sewer per City Standard #601. <br />6. Connect side sewer per City Standard n'S 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />�� Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector t� discuss potential drainage <br />routing prior to beginning the project. <br />! 11.- Install erosion control measures as determined by the Public Works inspector, such as silt <br />tence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />13. Remove erosion control measures upon completion oi the project prior to final approval of the <br />permit. <br />14.'All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan n's 305A <br />& 306 on this proposal's frontage as dire;ted by the Public Works Inspector (i.e. all unuse� <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard n307. <br />i7. Pave driveway from the iront property line out to the street paving. <br />/ ' <br />18. Contact the _? l� i i� l( i�" Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan r402 with a gas trap per Standard Plan n410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />m_nhole, then gravity flow across the public right-of-way. <br />21. A sprinkler system is �equired for this builning in compliance �vith the requirements of NFDA <br />Standards 13D. <br />a�accmmems �/ <br />`L <br />
The URL can be used to link to this page
Your browser does not support the video tag.