Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />q. Connect side sewer per City Standard #601. <br />5. Connecl side sewer per City Standard #'s 601, 602, 604. <br />6. Connect all roo(lop downspouts to the side sewer. <br />7. Connect roottop downspouts to the drainage system provided for this lot. <br />B. Rooftop runoff must be discharged to a roof d��wnspout infiltration syslem per City of Everelt Storm <br />Manual 3•2.62. The approximate size lrench is 3.5' wide, 2' deep and 25' long. See allachment for <br />more delails. <br />9. The contrector must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the project. Call Rand Allen at 425-339-7403 // CaII Cliff Lindman at 425-339-7404. <br />10. Install erosion conlrol measures as derermined by the Public Works inspector, such as silt fence, slraw <br />bales, swales, or erosion blankets. <br />13. <br />16. <br />Install erosion conlrol measures per City of Everett Slandards for small parcels <br />Remove erosion control measures upon completion of lhe project prior to final approval of the permit. <br />All excavated material from foundation, sidewalk and driveways shall be hauled lo an approved, <br />permitled site. No wasling of material is allowed on lhis building lot. <br />No dirt, mud, rocks or debris to be lracked onlo roadway. <br />No building malerials lo be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br />open for pedestrian travei. <br />Adjust waler meter box 1" above sidewalk grade. <br />17. Remove and replace curb, gutter and sidewalk as per City ot Everefl Standard Plan #'s 305A S 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />18. <br />19. <br />20. <br />Install a Type I concrete driveway per City of Everetl Standard #307. <br />Pave driveway from the front property tine out to the street paving. <br />Pave to existing paving in alley. <br />2S. Contactthe_ <br />sewer services. <br />�Z <br />23. <br />24. <br />Waler District for connecting provisions for this b�dilding's water and <br />A catch basin as per Cily Slandard Plan #402 with a gas trap per Standard Plan #410 is required for !he <br />parking area. <br />If a sewer pump system is lo be installed, lhe pressure line must discharge into a private manhole, then <br />gravity flow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with the requireinents of NFPA Standards <br />13D. <br />PWComments I Revimd o:6;17 <br />