Laserfiche WebLink
��� <br />o�x <br />C M <br />>Hti <br />C <br />H � <br />FC c] <br />H� <br />�NAO1 <br />yyp��HC <br />H^�g <br />Y,� n❑ <br />� H t�1 <br />gyy <br />c❑]Ct�n <br />3bCt" <br />HOy <br />� CIASED CM WORK ORDERS REPORT <br />UTILITIES Total Utility Maintenance Management System <br />03/11/1993 Pa e 1 <br />4 <br />________________________________________________________________________________ <br />Date Range :11/09/1900 - 03/11/1993 <br />CM l9ork Orde= Range :1001051070001 - 8405421080229Pattern :710123G710025 <br />Item Range :<Blank> - I+1VL3195Q19 Pattern :* <br />Prcgram ALL Function ALL Activity ALL <br />________________________________________________________________________________ <br />CDf WORK ORDER ID: 7101236710025 Title: REPAIR 8821 4TH PL SE <br />Item ID: DCB1885E21 -- CATCH BhSIN <br />Location ID: -- <br />Program 710 Function 123 Activity G71 <br />Date Completed: 03/11/1993 <br />Overall Craft: <br />Issued: 03/11/1993 <br />Out of Service? NO <br />Ideter Reading: <br />Downtime: 0 hours <br />Status: <br />Issued by: HDA Assigned to: SDD <br />Priority: Travel Time: 0.00 Hr. <br />Labor: <br />Craft ID Name Planned Hours Actual Hours Cost <br />----- ------ ------------------------------ ------------- ------------ --------- <br />UL LRR LARSON, RICHARD R. 0.00 8.00 96.08 <br />/�t HEO SDD STECHER, DANIEL D. 0.00 8.00 144.48 <br />� EO SR SIERRA, RAp10N (NhiI) 0.00 8.00 131.36 <br />1�' <br />Materials: <br />'�� I D <br />I�' CEME000G1438 <br />COUP50300447 <br />'�' N/A <br />' ' N/A <br />� PIPE50304547 <br />Vehicles: <br />ID <br />------------ <br />V213:f <br />V22?0 <br />V3507 <br />Description <br />--------------------------- <br />CEMENT 20 MIN. SET 50 L6. BAG <br />COUPLING 12" CONC X 12" Cl/PL <br />C.D.F. (ASSOC) <br />CB FRAME & GFATE (SATHER) <br />PIPE 12" PVC SEWER (13'LNGTHS) <br />Description <br />----------------------- <br />SVC TRUCK DODGE 84 <br />FORD 5 YD DUMP '90 <br />BACKHOE/LOADER CASE 4X4 <br />AS <br />Dato <br />02/11/1993 <br />02/11/1993 <br />02/15/1993 <br />02/16/1993 <br />02/11/1993 <br />Date <br />02/11/1993 <br />02/11/1993 <br />02/11/1993 <br />Number <br />Used <br />2 <br />1 <br />1 <br />1 <br />2 <br />Hours <br />8.00 <br />8.00 <br />8.00 <br />Cost <br />20.80 <br />17.17 <br />�—�.tibr�YS <br />-zivr3$= <br />9.6 <br />y�.�3 <br />Cost <br />41.60 <br />212.80 <br />17�.60 <br />Total cost for work order 7101236710025 1073 29 <br />