Laserfiche WebLink
May 11, 1998 <br />'llBL/C N/O/�IrS <br />TO: Tom Fuchs, Construttion Managemen[ <br />Jay Williams, Cons[ruaion Management � <br />FROM: Margaret McLeod, Public Services � <br />al���� <br />SUBJECT: Final Inspettion for Permit P54151 <br />(Plumbing for odor concrol project ac EWPCF, 4027 4[h St. SE) <br />An inspectioa of this work was done on December 4, 1997; and inspeaor Brian Waugh listed <br />a correa�on thac must be completed before final approval can be written. Copies of his <br />inspection report were faxed to you, but I have no record of any further response. Please <br />contact T'rian between 7:30 and 8:30 a.m. at 257-8810 to discuss the correaion, and to schedule <br />an inspection if the correction has been made. <br />I have enclosed copies of the pei•mit and inspection report. <br />Thanks in advana for your help in clarifying the status of this work! <br />cl: = l�,'aK <br />Nd jeS��c�ISZ- <br />CITY OF FVERETT• 3200 Cedar Slreet • Everett, WA 98201 •(425) 257-8800 • Fau (425) 257-8856 <br />