Laserfiche WebLink
�lttachment A <br />The first floor of all structures <br />minimum two feet of freeboard above <br />this fill must extend fifteet. feet <br />directions. The applicant must <br />Elevation Certificate/Floodproofing <br />document to the Planning Department. <br />must be elevated so there is a <br />the 100-year flood elevation and <br />beyond both structures in all <br />complete a Post Construction <br />Certificate and submit that <br />2. The applicant must prepare a landscaping plan for both structures <br />showing location, type, and size of plantings at the time of <br />installation, for review and approval by the Planning Department <br />pr�or to issuance of building permits for these facilities. <br />3• That construction or substantial progress toward construction uf this <br />project must be undertaken within two years after final approval of <br />the permit and completed within five years. If the p^oject has not <br />been completed in this time span, the permit will be reviewed by the <br />Flanning Department who will either extend the permit for one year or <br />terminate the oermit. <br />