My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4027 4TH ST SE 2018-01-01 MF Import
>
Address Records
>
4TH ST SE
>
4027
>
4027 4TH ST SE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 9:12:57 AM
Creation date
3/8/2017 12:05:06 AM
Metadata
Fields
Template:
Address Document
Street Name
4TH ST SE
Street Number
4027
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. l;tilitics necessarc to scrve dc��clopmenls permittcd in shorclinc <br />jurisdiction; <br />d. Sca•cr facilities necessary to transport sewage to the water pollution <br />control facility; and <br />c. �Nater trausmission and dislribution lines, natural gas lines, and electric <br />po��er lines, crossing Uie Snohomish River or olher ���ater Uodies. <br />rindings: The proposed building is :i non-���atcr-oricntcd u�ilih� which will be <br />placed wiUiin the ciry's �'�'PCP. <br />Conclusions: Since tlie building is part of an espansion of the V1'PCP, tl�cre is no <br />need to demonstrate that there are other opu� �s avaitable to locate outside the <br />shoreline area. <br />3. Where utility construction or maintenance activities �ti�ill result in disruption <br />of shurclinc vegetation, developmcnt plans shall include provisions for <br />tcmporary soil staUilizatiou during constructimi and for restoration of thc sitc <br />to preconstruction appearance upon completiou of tlie project. i3u1'fers shall be <br />re-establislicd and/or cuhanccd as required b}� the SMP. <br />Fiudings: Thc building wiil Ue locatcd over ]00 fcet fron� the shorcline. <br />Couclusions: No shomline vegetation will be disturbed. <br />4. Utilit}� facilitics shall be locatcd �md designed so as to minimizc or pre��ent <br />tl�c need for shorelinc protectivc mcasures. <br />Findings: The building will be located over l00 feet from the shorelinc. <br />Conclusions: No shorclive protective measures are necessar} . <br />�. Structural abutmenls ur landfill required for permilted water crossings shull <br />Uc located lunchrnrd of �he OHV1'�l, unless no rc�sonaUlc aller:iative exists. <br />rindin�;s: No water crossing; are propose�. <br />Conclusion: This is not applicable. <br />C. Nc��� utilit}� iustallations in thc si�ureline arcas sliall bc designed and instrlled <br />lo be a:estheticalh• pleasiug, and not significauth� imp�ct vie��s of the shorcline. <br />Findi��gs: The 35-fbot tall building will be located east af die Snohomish Rivei. <br />Views of thc Sr,ol�umisli Ri��er front residences ro the �vest of die Snohomish River <br />will not Ue impacted. The Uuilding ma�� be visible from some msidences located <br />west of thc Snohumish River. <br />
The URL can be used to link to this page
Your browser does not support the video tag.