Laserfiche WebLink
necessary future expansions, which dictate the location of the <br />propased structure. <br />b. Conclusions: The proposed 'ouilding is being located such as to <br />�ake into account the limited building area on site. Due to the <br />locatio�i of on site in(rastruc;ure and the proximiry to the shoreline the <br />requF �ted variance is not tiie result of a self-created hardship. <br />NOW, THEREFORE, the Board of Adjustment of the Ci:y of Everelt does hereby <br />order that lhe requested variance be APPROVED to allow for modification of the <br />flood proofing requirements for a new maintenance building and driveway. <br />i he action of the Bcard of Adjustment in APPROVING a variance shall be final and <br />conclusive, unlc�s within twenty-one (21) days from the date of decision an <br />aggrieved person or persons obtains a writ of certiorari from the Superior Court of <br />Washington for Snohomish County for tlie purpose of review of the action taken. <br />DATED this 5'�' day of May, 20C3. <br />� f --C.QiL.J <br />Chairman, Board Adjuslmenl <br />Notes to Applicant: <br />If a variance is approved, building permits are required and must be obtained <br />within ona year from the approval date after which tfie Board of Adjustment's <br />decision shall cease to be effective. Prior to the expiration date, a written <br />request for a six-monlh extension may be submitted to the Planning Director. <br />2. A copy of this order must be submitted by the Applicanl when applying for <br />building permit :. <br />3. Compliance with all condi'�ons of the SEPA, SPU, JARPA, and Shoreline <br />permit is required. <br />S�BFawer\Varianccs\1VPCF Order.doc <br />