Laserfiche WebLink
January l4, 2003 <br />H'.yA Project No. 2002-146-21 <br />Mr. Laurrnce Oeth, P.E. <br />Brown .�nd Caldwell <br />9620 SW Barbur Boulevazd, Ste 200 <br />1'ortland, Oregon 97219 <br />Subjxt: <br />Dear Mr. Oeth: <br />GEOTECHM.CAL REPORT <br />City of Everett WPCF, New Maintenance Building <br />Everett, Was6ington <br />Yllfii <br />HWAGEOSCIENCES INC <br />. <br />19730•64TN AVE. W., SUITE 200 <br />IYNNWOOD. WA 9lO16-S937 <br />7EL 425-774-0106 <br />FAx.425-77a-271a <br />www. hw�q�of N�n.w.com <br />�U3�7-oz� <br />t�c�1�`{"�tf SF <br />In accordance with your request, HWA GeoSciences, Inc. complet� a design level <br />geotechnical siudy for the proposed new maintrnance building project located at the City <br />of Everett Water Pollution Control Facility (\'VPCF) in Everett, Wash'u:gton. <br />Recommendations aze presented for desi�� zad construction of the new maintenance <br />building, based on available subsurface data and the cuirent building design concept. <br />We appreciate this opportunity to be of service. Should you have any questions or <br />comments regazding this repoct, please call at your convenience. <br />Sincerel}•, <br />HWA GeoSc�NCEs, Wc. <br />/,/ii/���w"i" �f(!•"7�/O_S" <br />Michelle L. Ramos, P.E. <br />Gcotechnical Engineer <br />;.1LR:RNB:mb(2002146 rcpoctdoc) <br />GEOLOGY <br />GEOENViRONMENTAL SERV2CE5 <br />MVUR�GEOLOGV <br />GEOTECMNIUL ENGINEEPING <br />TESTiNG 6 INSPECfION <br />