Laserfiche WebLink
��� <br />��x <br />C H <br />9Hti <br />r <br />y �-�i <br />.� ci <br />H� <br />y�H <br />x <br />�HC <br />��g <br />> H [�1 <br />y <br />t HH <br />gy <br />H <br />C] C7 N <br />��Cn <br />2H[/� <br />HOfn <br />. ...:.i�r,c . ....._...�... . <br />... ..�a::!3lehJ.1�•'.r..l'P:'.'.i:) .....it:hlL:O/l'A.�� r � .�.:..�.. . .�,.:a..:. .�. �.Cn. :�'ix_.-:..•. <br />, Ct <br />�t <., � C�; �.. � � <br />�.. � l`:''_i it, � ,I <br />�' PUBLIC WOR2CS DEPARTMENT <br />- � JUL2° ���� y UTILITIES DIVISION <br />COST ESTIMATE SFiEET � ����"""' <br />�VERETT. <br />.......CITY OF � <br />public Works Dept. <br />Receipt � S- �/ � <br />X Cost of Work Order $ 550.00 <br />Cost of Service Order $ <br />2300 CEDAR STRBET <br />EVERETT, WASHINGTON 9II201 <br />(206) 259-8800 <br />Date Paid %"3o-i / <br />Work Order ,� <br />Service Order # <br />Contact Person: Telephone $ <br />Requested By: Andv Zuanich Date of Itequest <br />Property Owner (name) <br />Charge Cost to (name if different than owner) <br />Address 10G26 20th Dr SE City Everett Zip 98208 <br />Installation Location lst main <br />Installation type/description/size/etc. Shut down, drain 1 blk of main. <br />Make final hookup put water main back in service Develooer will <br />excavate shore hole and restore area. <br />[] The following estimate is based upon the Utilities Division <br />providing all labor, equipment, materials, restoration, and final <br />hook-up. <br />[] The following estimate is based upon the Street Division work group <br />providing all laUor, equipment, materials and restoration to <br />property. <br />Whenever the eatimated coot ie noc a�fficlent to covur the total oxpenee for labor, <br />material, equipment ren�al and adminiutrative coato, the deficit ohall be charged to <br />the proporty for wliich euch ineCallation was made and the owner thereof, and provided <br />further� that any excenn paymenC ehall be returned to the pereon applying for the <br />inetallation. <br />itemized Cost Estimate: <br />Labor & Overhead <br />Material <br />Equipment Rental <br />Surface Restoration <br />Total <br />400.00 <br />too.00 <br />50.00 <br />550.00 <br />Prepared by o.D Wahl <br />Accepted b� �� Re�resentinq <br />cc: Clieryl Fontaino <br />Clair Olivere <br />Tom Thetford <br />Don Weltkamp <br />Ki Brooko <br />G�D Wi fi�ev� <br />��0. Don Wahl <br />Dan Lowell <br />Stan Mitchell <br />