Laserfiche WebLink
r <br />Dateq� <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Public Works Permit a <br />Bldg. Debt. a _ <br />Public Works Fee <br />Total Fee S <br />Less ii Fee Paid S <br />Balance Due S <br />��9,C hb%rr" .. jiry�i d ✓cr»� n/: `d E%r.'% /�,fi.><� '> 5'��_ <br />Address City <br />Zip <br />Describe Proposed Work /it"n)d LTC L•%/v (J X/$T/it/U ���rra <br />LU <br />Project Address (if known) J "V 7W 6�1C% <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />DO ' <br />NOT WRITE BELOW THIS LINE <br />PERMIT CONDITIONS <br />O <br />1. All calls for inspection shall be made 24 hrs, in advance - phone 259.8815. <br />in <br />2. Ail work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1.800.424-:i555. <br />177, <br />O <br />a <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />[0everett PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />Phone: 259.8815 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harm. <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right of -way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION, THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />