Laserfiche WebLink
STATE OF �YASHINGTON <br />DEPARTMENT OF HEALTH <br />P.O.Box4i8i2 • Olympia,LVashington98i0�•:Ai? <br />Diane Haugen <br />Katherine Court <br />21902 38th Ave. W. <br />Brier, Washington 98036 <br />January 13, 1995 <br />RE: Katherine Court <br />Proposed Boarding Home <br />Fire Sprinkler Phase <br />CRS #94794-4097-007 <br />Dear Ms. Haugen: <br />I received the fire sprinkler shop drawing and hydraulic calculations from Moore Fire <br />Protection on December 6, 1994. The State Fire Marshal has completed a review of these <br />documents. His review comments are below. <br />STATE FIRE MARSHAL'S REVIEW <br />Mike Paddock (360) 705-6784 <br />Approval inspections by the State Fire Marshal are reyuired for final acceptance of <br />all projects involving new or modified sprinkler systems. Enclosed with a copy of this <br />letter to the contractor is the material and test certificate to be filled out and kept <br />available on the premises. Section 1-10, Uniform Building Code Standard No. 38-1. <br />I am returning a set of stamped "Approved" fire sprinkler shop drawing and l�ydraulic <br />calculations for your use at the job site. These documents shall remain on file and available, <br />in good condition, for inspection at the job site until the project is completed. I recommend <br />these documents become a permanent part of the facility records. <br />rt .,��:;. <br />