Laserfiche WebLink
7�PPROVAL <br />VIOLATION <br />�I�S�ECTION REPORT <br />v� � <br />Addr ss _�J�O� S' Q� A�`e <br />Contractor�G_iL�ar') t_— <br />�l <br />Owner <br />Date _ � �— % a — / r,'"--- <br />J PARTIAL APPROVAL <br />J CORRECTION REQUESTED <br />J Corrections listed below MUST BE MADE before work can be approved. <br />� Please contact inspeclor and arrange lor appointment. <br />� Was not able to perform inspection. <br />J CALL 259•8810 POR REINSPECTION — 24 hour notice requued <br />A CERTIFICATE OF OCCUPANCY SHALL BF ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />� Date <br />TYPE OF INSPECTION REQUESTEL <br />J Terjp��ect. J Framinq <br />J Footmg J DrywalL Nailing <br />J Foundation J Shear Nailing <br />J Duciwork J Grid <br />J Wood Slove J Rough-in <br />J Masonry J Service <br />:J Other <br />�FBLDG: Pmt. No. L�` �� J MECH: Pmi. No. <br />J ELEC� Pmi. No._� _ J PLBG: Pmt. No.. <br />J Gas Piping <br />J Consultation <br />J Groundwork <br />.1 Slrucl. Slab <br />J Final <br />CJ.Lnsulation <br />