My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5205 S 2ND AVE 2018-01-01 MF Import
>
Address Records
>
S 2ND AVE
>
5205
>
5205 S 2ND AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 8:45:08 AM
Creation date
3/8/2017 12:21:43 AM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5205
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Simpson Lee Paper Compan,, <br />,-a',-�'�;'�>. <br />'-: �. <br />Buildinq Department <br />Room 203, ��ty Hall <br />Everett, YJashington ' <br />AtCn: 1�1r. Lawrence J, Dougherty <br />Gentlemen: <br />Evcrett, R'nehinqton • �f�-21'll <br />T�pg gq' �p • Arm Codc:.A1 <br />Septem�.�er 14, 1^65 <br />,: <br />/' <br />,- .�. <br />., <br />, ,1" <br />j'; <br />Reference our diso�ssion concerning thc: plans <br />and specifications for the nev� buildin� to be construcYed <br />adjacent to our present Convertin9 Departmc:nt building. <br />As explained i� our dis<:��s•,�on, due to the nature of thc <br />building and the related equipment that wi��l be installed <br />in Chis location, plans and specifications of the electri- <br />cal and mechanical portion are not: complete at this time. <br />In an effort to save time in the completion of this work, <br />�ae are requesting permission to procede �aith this project <br />with the understanding that we will submit to your deparc- <br />ment ptans and soecifications of the electrical and mechan- <br />ical portion of tliis �ob for approval prior to our request <br />for bids for this work. Final pians covering the A.lectrical <br />and mechanical portion should be completed for your approval <br />�vithin sixty days. <br />Thank you for your cooperation in this matter in <br />issuin,_� Che building perr�it prior to approval of the elec+:ri- <br />cal and niechanical portion of the �^iork. <br />�incerely, <br />� % <br />�. c'.cvn- (L G,�.E2:,�a«��; <br />Dean A. Bost�•�icl< <br />Purchasinq Aneni_ <br />D�B:ci�:� <br />Puprr mills nt livnrriL. lYnshuigtun: liipon. C�..li[ornin nud Vicksburg. 7.1�ch�l;uu <br />
The URL can be used to link to this page
Your browser does not support the video tag.