Laserfiche WebLink
REPLACEh1ENT COST APPROACH <br />Square foot method includes in base cost, forced air heating, asphalt <br />tile floors, acoustical tile ceilings which the subject does not have; <br />also better qualiiy than subject. Base also 16-foot ceiling height, <br />foundation and roof. Dase also includes roo`, gutters and downspouts. <br />r <br />First rloo r. Base 517.70 per sq. ft. less above -$2.90 or $14.80/sq. ft. <br />4,704 sq. tt. x$14.80 per sq. ft. _ <br />Less Roof: 4,704 sq. ft. x$3.08 = <br />�econd Floor: 4,704 sq. ft. x$14.86/sq. ft <br />l.ess Foundation <br />Basement: Includes outside walls, fi�oers, <br />boundation, electrical, plumbing, <br />posting and 800 sq. ft. M/! of <br />basement finishing. <br />Toial: <br />4,704 sq. tt. r. $4.40/sq. ft <br />y <br />S 69,619 <br />- 14,488 <br />8 55,131 <br />_ $ 69,901 <br />- 7.200 <br />S 62,701 <br />_ $ 20.697 <br />8138,529 <br />Rounded to� 5138,500 <br />