My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5218 S 2ND AVE 2016-01-01 MF Import
>
Address Records
>
S 2ND AVE
>
5218
>
5218 S 2ND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 6:51:34 PM
Creation date
3/8/2017 12:24:38 AM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5218
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST �STIMATE SHEET <br />PUBLIC WORKS DEPARTMEN'i' <br />UTILITIES DIVISIOIJ <br />2300 CEDAR STREET <br />EVERETT, WIeSHINGTON 98201 <br />(206) 259-8800 <br />Recei}3t # 2 � Date Paid ' ' <br />Cost of Work Order $ Work Order # <br />X Cost of Service Order $ 5539.00 Service Order #� <br />Requested By: Frank Stipek Date of Request 11-14-f38 _ <br />ProPerty Owner (name) Lowell Communitv Church <br />Charge Cost to (name if different than owner) Same <br />Address 5000 South Second City Everett Zip _ 98201 <br />Installation Location Same <br />Installation type/description/size/etc. Excavate hot tan, construcC <br />vault and restore area <br />The following estimate is bz.sed upon the Utilities Division providing <br />all labor, equipment, material.s, restoration, and final hook-up. A <br />double check valve assembly for temporary service is availabl.e from the <br />City's Permit Counter by requesting a Hydrant Use Permit with an <br />additional deposit. <br />Whenever the estimated cost is not sufficient to cover the total expense <br />for labor, material, equipment rental and administrative costs, the <br />deficit shall be charged to Che property Por which such installation was <br />made and the owner thereof, and provided further, that any excess <br />payment shall Ue returned to the person applying for the installation. <br />itemized Cost .:stimate: <br />Labor & Overhead <br />Material <br />S 2688. <br />$ 21U3. <br />Equipment Rental $ G4II. <br />Surface Restoration _�_].00. <br />Service Order Cost $ 5539. � <br />Total � <br />Prepared by O. Wahl <br />cc: Susy Haugen <br />Clair Olivers <br />Tom Thetford <br />Don 'Aeitkamp <br />Kirk Brooks <br />Gordon Witcher <br />Revised 12/5/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.