My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5309 S 2ND AVE 2018-01-02 MF Import
>
Address Records
>
S 2ND AVE
>
5309
>
5309 S 2ND AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 2:52:13 PM
Creation date
3/8/2017 12:26:19 AM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5309
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Evaluation for <br />Agency Use Only <br />The proposed project does not occur in areas <br />used for water transportation. <br />The Burlington Northern Railroad line paral- <br />lels the proposed cable route from 899+69 <br />(near Hwy 9) to 1149+80 (railroad right-o:'oay <br />intersection with Everett City limits and to <br />the City of Snohomish along Lowell River Road. <br />Harvey Airfield is located to the southeast <br />of the proposed cable route near the City of <br />Snonomish. <br />f. How many vehicular trips per day would be <br />generated by the completed project? If known, <br />indicate when peak volumes would occur. <br />The completed project will not generate vehi- <br />cular traffic on a daily basis. occasional <br />traffic may be generated on an infrequent <br />basis in the event of cable repairs or during <br />surveys to verify cable location prior to <br />construction in the area. <br />g. Proposed measures to reduce or control <br />transportation impacts, if any: <br />No significant impacts are anticipated, there- <br />fore mitigation measures have not been pro- <br />posed. <br />15. Public Services <br />a. Would the project result in an increased <br />need for public services (for example: fire <br />protection, police protection, health care, <br />schools, other)? If so, generally describe. <br />None. <br />b. Proposed measures to reduce or control direct <br />impacts on public services, if any. <br />No signi:`.icant impacts are anticipated, there- <br />fore mitigation measures have not been pro- <br />posed. <br />-17- <br />
The URL can be used to link to this page
Your browser does not support the video tag.