Laserfiche WebLink
TABLE 2 <br />GENERAL DESCRIPTION OF SHORELINE MANAGEMENT AREA CROSSINGS <br />AND NON -SHORELINE MANAGEMENT AREA CROSSINGS OF CONCERN <br />FOR U.S. SPRINT ROUTE IN SNOHOMISH COUNTY <br />Sheet 1 of <br />STREAM <br />STEEPEST <br />SOIL <br />SPRINT MAP SMA/ TERRAIN <br />BANK <br />SLOPE <br />INSTABILITY POTENTIAL <br />LOCATION SECTION MAP NO. STATION NON SMA SLOPE <br />SLOPE <br />(PERCENT) <br />(TYPE) EROSION <br />Snohomish River 2 16-22 858+00 to SMA Flat Moderate 40% None No <br />1149+00 <br />Snohomish River 3 2-6 19+15 to SMA Flat Moderate 20% None No <br />310+37 <br />SMA Shoreline Management Area Crossing <br />Non-SMA Non -Shoreline Management. Area Crossing <br />