Laserfiche WebLink
Dated D$ <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Address <br />Describe Proposed Work <br />Project Address (if known) .JJ'n,p— S �'/w� <br />City <br />LIP <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable <br />Public Works Permit e 1N 28" <br />Bid,__ <br />Public Works Fee S <br />Total Fee <br />Less pl. Fee Paid $ — <br />Balancecepull $ <br />• Property Lines <br />• Centerline of street <br />• Outline and dimensions of all existing and <br />• Indicate North <br />proposed structures on the lot <br />• Show any proposed grading changes <br />• Existing and proposed utilities <br />• Show measurements <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance- phone 259.8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800.424.5555. <br />r ele_v / /'d & c?in <br />� > 7/9- eR <br />Approved for Construction Date <br />NAL INSPECTION Date <br />Approved as Constructed <br />i <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />Phone: 259.8810 <br />94101 L <br />ACKNOWLEDGEMENT OF CONDITIONS <br />z <br />O <br />V♦ <br />O <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs. <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to rl;place public properly damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS P RMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION, <br />