Laserfiche WebLink
I • � <br />� <br />The following information is req�ired: <br />. All structural connections for the new roof for the first floor unit and replacement deck for entry to <br />the second floor uni�. <br />•�undation sunoorts for the new rooF for the first floor unit and replacement deck for entry to the <br />second floor units. <br />. Calculations for wind, snow and seismic loads. <br />• A section through the second Floor deck and new first Floor roof to show the overlap of inembers. <br />• Rela[ionship of first Floor roof framing and structural supports to the required 2 hour fire barrier, <br />inciuding details in plan and in section. <br />,. A grephic differentiation between new and existing work (new is dark, existing is light). <br />o For example, the new roof insulation is shown as light (shouid be shown as dark), and the <br />extent of the area of new insulation is not indicated in plan. <br />o Detail 8 is called a siding detail but it appears to be the detail for the new (?) guard, but there <br />is no reference to new or existing work, and the scope is not shown in elevation. Can't tell from <br />the detail what is new or existing, in words or in line weight. <br />. The drawings do not indicate a new roof except for details-need scope shown in pian and sedion. <br />Hope that helps and sorry for the delay! A formal corrections Ietier will be sent with code references on <br />Monday afternoon/evening. <br />Sest, <br />Meg <br />pleg HaleV. NCARB <br />Conrmerna/ P/ar,s Eram�ner <br />Evereft Public Works/Bui/dina Deva�rtmenl <br />3200 CCAar St <br />Everett, WA 98201 <br />T 425.257.8813 <br />F 425157.8856 <br />zjv <br />