My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5414 S 2ND AVE 2018-01-02 MF Import
>
Address Records
>
S 2ND AVE
>
5414
>
5414 S 2ND AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 3:19:26 PM
Creation date
3/8/2017 12:32:07 AM
Metadata
Fields
Template:
Address Document
Street Name
S 2ND AVE
Street Number
5414
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />a) Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooftop downspouts to the side sewer. <br />8. Connect rooftop downsoout� <br />1 <br />oft�pftr ff m'� , be schafged o <br />r or fAarral 3-2.6.2.� Width De <br />10._A catch basin as per City Standard Plan <br />required for the parking area. <br />#402 with a gas trap per <br />per <br />#410 is <br />11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard #307. <br />13. Pave driveway from the front property line out to the street paving. <br />14. Contact the _ <br />water and sewer services. <br />Water Cistrict for connecting provisions for this building's <br />15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />88. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />(19 )nstall erosion control measures as determined by the Public Works inspector, such as silt <br />�,�fence, straw bales, swales, or erosion blankets. <br />CRemove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />Install erosion control measures per City of Everett Standards for small parcels. <br />P <br />Mcommems <br />
The URL can be used to link to this page
Your browser does not support the video tag.