Laserfiche WebLink
INSPECTION REPORT <br />Date//-3o 2,,Penni&XIO-02�, <br />Contractor: <br />Owner: <br />Site Address:___s6-� <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL <br />BUILDING <br />MECHANICAL <br />PLUMBING <br />[] Temp Service <br />❑ UFER ground <br />❑ Groundwork/Slab <br />❑ Groundwork/Slab <br />❑ Groundwork <br />❑ Fooling <br />k Rough In <br />$hough In <br />❑ Slab%Conduit <br />❑ Foundation <br />❑ Coiling Grid <br />❑ Ceiling Grid <br />❑ Rough In <br />❑ Structural Slab <br />❑ ON to Insulate <br />❑ OK to insulate <br />❑ Service <br />❑ Framing <br />❑ Roollop Units <br />❑ Water Service <br />❑ Grounding <br />❑ Insulation <br />❑ Mechanical Final <br />❑ Medical Gas <br />❑ Coiling Grid <br />❑ Drywall Nailing <br />❑ Plumbing Final <br />❑ Electrical Final <br />❑ Shear Nailing <br />GAS PIPE <br />SITE WORK <br />❑ Root Nailing <br />❑ Rouph IniSemice <br />Hot Water Tank <br />[] Footing drains <br />❑ Ceiling Grid <br />n Reingeration <br />❑ Rough in <br />❑ Root drains <br />❑ Building Final <br />Pipe Final <br />❑l HHWWT Final <br />OTHER OR CONSULTATION: <br />.� ,❑1/Gas <br />_ - -_ <br />4-2 <br />;�GQPPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br />0 OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br />OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: <br />❑ CALL (425) 257-8881 FOR REINSPECTION — 24 hour notice required <br />--- <br />------ --- Date: <br />e TABAR. INC. <br />