Laserfiche WebLink
COST ESTIMATE SHEET <br />MAPR 1 5 1988 <br />" 1...........CITY...OF...�VERETT....... <br />Receipt # 971 %-�I public Vlorks Dept. <br />x Cost of Work Order $ 3,078 <br />Cost of Service Order $ <br />Requested By: <br />PUBLIC WORKS DEPPAARI T <br />UTILITIES DIVISION <br />2300 CEDAR STREET <br />EVERETT, WASHINGTON 98201 <br />(206) 259-8800 <br />Date Paid <br />Work Order # ,74 <br />Service Order # <br />Date of Request <br />Property Owner (name) William Fulton <br />Charge Cost to (name if different than owner) same <br />Address 3901 Smith Street City Everett Zip 98203 <br />Installation Location 4205 South 3rd Avenue <br />Installation type/description/size/etc. Hot tan 8" main break <br />outside sidewalk. Install fire hydrant and restore area <br />The following estimate is based upon the Utilities Division providing <br />all labor, equipment, materials, restoration, and final hook-up. A <br />double check valve assembly for temporary service is available from the <br />City's Permit Counter by requesting a Hydrant Use Permit with an <br />additional deposit. <br />Whenever the estimated cost is not sufficient to cover the total expense <br />for labor, material, equipment rental and administrative costs, the <br />deficit shall be charged to the property for which such installation was <br />made and the owner thereof, and provided further, that any excess <br />payment shall be returned to the person applying for the installation. <br />Itemized Cost Estimate: <br />Labor & Overhead 1,344 <br />Material 1,310 <br />Equipment Rental 324 <br />Surface Restoration 100 <br />Service Order Cost <br />Total <br />3,078 <br />Prepared by Oliver Wahl <br />cc: Tim Tyler <br />Don Aeitkamp <br />Larry Crawford <br />Bob Chervenell <br />Clair Olivers <br />Revised 3/15/88 <br />