Laserfiche WebLink
everett INSPECTION REPORT <br />eAddress <br />Contractor h <br />— <br />Owner i� <br />Date 57�_$� <br />TYPE OF INSPECTION REQUESTED <br />FJ BLDG: Pmt. No. .r-1 MECH: Pmt. No. _ <br />❑ ELEC: Pmt. No. �� PLBG: Pmt. No. <br />❑ Temp. Elect. ❑Framing -- <br />❑ Footing Cl Drywall, Nailing Gas Piping <br />❑ Foundation ❑Shear Nailingg Consultation <br />❑ Ductwork ❑ Grid Groundwork <br />❑ Wood Stove ❑ Rough -In O Struct. Slab <br />_LLdakon fCService ❑ Final <br />DLATION n PARTIAL APPROVAL <br />CORRECTION REQUIRED <br />❑ ell listed below k1UST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />�tL 259.8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector <br />Dale <br />