Laserfiche WebLink
. -i <br />i <br />CLOSED CM WORR ORDERS REPORT <br />Total Utility Maintenance Management System <br />O5/12/1995 Page 1 <br />Date Range :O1/09/1989 - 05/OS/1995 <br />CM Work Order Range :1001091070001 - 8801086100085Pattern :7401196751259 <br />Item Range :<Hlank> - WN122020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />__________________________________________________________________________ <br />CM WORK ORDER ID: 7401196751259 Title: CONVERT 4223 S9HYH 3RD AVE <br />«DUPLICATE PRINTING OF THIS WORK ORDER» S <br />Item ID: WS3295F028 -- WATER SERVICE <br />Location ID: -- <br />Program 740 Function 119 Activity 675 <br />Date Completed: O5/05/1995 <br />Overall Craft: <br />Issued: 05/04/1995 <br />Out of Service? NO <br />Meter Reading: <br />Dowtitime: 0 hours <br />Status: <br />Issued by: JSM Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Labor: <br />Craft ID Name Planned Hrs Actual Hrs <br />----- ------ ------------------------------ ----------- ---- - <br />UL SSJ SMITH, STEVE J. 0.00 3.00 <br />WST WDT F�ALDEN, DAROLD T. 0.00 3.00 <br />Mateiials: <br />ID <br />ADAP34000547 <br />BOX000065547 <br />COUP34003347 <br />COUP34004647 <br />ELIA34101447 <br />ELLA34104247 <br />METE36089447 <br />NIPP34131247 <br />VALV34008348 <br />vehicles: <br />ID <br />V2117 <br />Description <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX METER CONC W/S'PEEL LID <br />COUPLING 3/4" COMPRESSION @ <br />COUPLING 3/4" ANG MET X FIP @ <br />ELL 3/4" 90 DEG BRASS _ <br />ELL 3/4" STREET BRASS <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />NIPPLE 3/4" CLOSE BRASS <br />VALVE METER 3/4" IACR WING IP@ <br />Description <br />------------------------------ <br />91 CHEV 1-TON HYD i1NIT <br />Total Labor Cost: <br />Date <br />05/05/1995 <br />05/O5/1995 <br />OS/05/1995 <br />OS/05/1995 <br />O5/O5/1995 <br />05/O5/1995 <br />05/05/1995 <br />05/OS/1995 <br />05/OS/1995 <br /># Used <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Total Material Cost: <br />Hours Cost <br />------ ---------- <br />3.00 16.80 <br />Total Vehicle Cost: 16.80 <br />Work Description: <br />-------------------------------------------------------------------- <br />METER�r 40304262 <br />Cost <br />45.09 <br />60.24 <br />105.33 <br />Cost <br />31.04 <br />28.64 <br />7.19 <br />4.58 <br />1.29 <br />1.71 <br />27.90 <br />0.77 <br />8.36 <br />111.48 <br />• <br />