Laserfiche WebLink
xr� <br />ay <br />e H <br />9 H CA <br />y z3 <br />MH <br />�1 N'il <br />y C <br />9d <br />WOE <br />ZHR <br />�t�rttt INSPECTION REPORT <br />Address '-1%- 2 Sr <br />Contractor <br />Owners/�, <br />Date 7-9 <br />TYPE OF INSPECTION REOUESTED <br />❑ BLDG: Pmt. No. ❑ MECH: Pmt. No. <br />OtLEC: Pmt. No. <br />1 S'/ U ❑ PLBG: Pmt. No. <br />❑ Temp. Elect. <br />❑ Framing ❑ Gas Piping <br />❑ Footing <br />❑ Foundation <br />❑ Drywall, Nailing ❑ Consultation <br />❑ Shear Nailing ❑ Groundwork <br />O Ductwork <br />❑ grid ❑ Struct. Slab <br />❑ Wood Stove <br />ough•In ❑ Final <br />❑ Masonry <br />❑ Service ❑ <br />❑ APPROVAL <br />El PARTIAL APPROVAL <br />❑ VIOLATION <br />&C'ORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259-88 10 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector_ Date <br />9 <br />1 <br />41 <br />,a <br />