Laserfiche WebLink
. ,. �, <br />REPAIR SPEC2� _..ATIONS AND LIST OP �JORK '�.+ BE BID <br />Address: <br />0 <br />page5 of 11 <br />70i� S 3rd <br />Relocate existing washer and d�yer to new main floor <br />laundry area. Vent dryer out of house wall to code. <br />Relocate existing hot water tank to main floor closet <br />where stairwa�• wa� removed. Hoak up and provide <br />necessary piping and drainage to ccde. Insulate hot <br />water tank upstairs. <br />Electrical A11 new electrical work : in accordance <br />wi.th the National Electrical Code, 1981 edition. <br />Install new 200 amp electric service panel on new meter <br />for basement apactments. Put all circuits serving <br />basement, except furnace circuit, on new panel. Pane1 : <br />GE �r equal and : installed to meet PUD standards. <br />Install new duplex outlets, switches and light fixtures <br />as shown. Material allowance for light fixtures :$15 <br />per fixture. Outlet in bathroom : GFI. <br />2rovide appropriate wiring and outlets for range in <br />basement and washers and dryers in basement and on main <br />flooc in closet of southeast be�iroom. Pcovide wiring <br />for hot water tanks in basement and on main floor. <br />Install new electric exhaust fan over kitchen sink <br />window, switched by sink. <br />Install new battery operated smoke �9etectors in t'�sement <br />apartment on ceiling outside bed.room door=_ and on <br />ceiling in living �oom. <br />Heate�s <br />Install new baseboacd electric heaters in each bedroom <br />as shown. Install new recessed electric heaters, Square <br />"D" or equal, in living room, bathroom and kitchen as <br />shown. A11 heaters . operated by wall mounted <br />thermostats and • capable of maintaining 70° F three <br />feet above the floor at the outside de,sign tempecature. <br />-.. <br />9, Furnace Relocate fur�ace as o d�Wo en nn with masonry <br />opposite side oE chimne , cap p 9 <br />t0 COae. <br />Re-route furnace ductwock in ceiling of basement <br />apartment as necessary £or new fucnace location and to <br />clear suspended ceiling. Re-route fuel line to new <br />furnace location. <br />�_0. uiscellaneous Soecialties Install new shelves and <br />hanger rods in both bedroom closets as shown. Shelf and <br />rod intermediate support. Shel£ : particle board, <br />3/4" .with 1/2" x 3/4" trim on exposed edae. Varnish <br />trim to match other trim in bedrooms. Shelves . 18" <br />deep. Install shelf and hanger cod in coat closet. <br />z <br />O <br />--I <br />� <br />m <br />.. .. <br />� �� <br />H H <br />N S <br />m <br />co <br />mc <br />� <br />--� c <br />o- <br />�� <br />-a � <br />m ' <br />o z <br />c <br />�i <br />.. �. <br />�� <br />"` �, <br />oz <br />-n a <br />� �*; <br />x <br />m �-� <br />o `f <br />or <br />n r� <br />c v� <br />z� <br />m <br />z �: <br />�m <br />n <br />