Laserfiche WebLink
% <br />l <br />CLOSED CM WORIt ORDERS REPORT / <br />Total Utility Maintenance Management System <br />OS/08/1995 Page 1 <br />-------------------------------------------------------------------------------- <br />Date Range :O1/09/1989 - 04/30/1995 <br />CM Work Order Range :1001091070001 - 880108G100085Pattern :7401196751251 <br />Item Range : :Blanv> - i�+122020001 Pattern : * <br />Program ALL Function ALL Activity ALL <br />________________________________________________________________________________ <br />CM WORK ORDER ID: 7401196751251 Title: CONVERT 5118 S� 3RD AVE <br />Item ID: I4S3295X016 -- WATER SERVICE <br />Locati.on ID: -- <br />Program 740 Function 119 Activity 675 <br />Date Completed: 04/28/1995 <br />Overall Craft: <br />Issued: 04/28/1995 <br />out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL LMA <br />WS'I' TDE1 <br />Materials: <br />ID <br />ADAP34000347 <br />ADAP34000547 <br />ADAP34000647 <br />BOX000056247 <br />COUP34003347 <br />NIPP34131247 <br />NIPP34131847 <br />PIPE3406G647 <br />VALV34U08348 <br />VALV34008648 <br />Issued by: JSM Assiqned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />------------------------------ <br />LISBING, MAURICE A. <br />THOMPSON, DWAYNE E. <br />Description <br />ADAPTER 3/4" CST X ZNSTA-TITE@ <br />ADAPTER 3/4" NIP X INSTA-TITE@ <br />ADAPTER 3/4" FIP X INSTA-TITEC� <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" COMPRESSION @ <br />NIPPLE 3/4" CLOSE SRASS " <br />NIPPLE 3/4" X 3" ARASS " <br />PIPE 3/4" POLY I.P.S. <br />VALVE METF.R 3/4" LOCK'WING IP@ <br />VALVE METR 3/4" L/W FLARD COP@ <br />Planned Hrs Actual Hrs Cost <br />----------- ---------- ---------- <br />0.00 1.50 22.25 <br />0.00 2.50 40.88 <br />Total Labor Cost: 63.12 <br />Date <br />C4/28/1995 <br />04/28/1995 <br />04/28/1995 <br />04/28/1995 <br />04/28/1995 <br />04/28/1995 <br />04/28/1995 <br />04/28/1995 <br />04/28/1995 <br />04/28/1995 <br />,", Used <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br />1 <br />1 <br />Total Material Cost: <br />Vehicle�: <br />ID Description Hours Cost <br />------------ ------------------------------ ------ ---------- <br />V2146 87 CHEV 1 TON W/HYD. UNIT 2.50 12.75 <br />Total Vehicle Cost: 12.75 <br />Cost <br />7.48 <br />15.18 <br />7.00 <br />12.94 <br />7.19 <br />0.75 <br />1.12 <br />0.72 <br />8.36 <br />10.17 <br />70.91 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />CONVERTED TO METER BECAUSE IT WAS RIGHT NEXT TO ANOTH�R SERVICE. <br />METER,'�, NO METER/PUT IN METER JUMFER <br />