Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />�3. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />��6./ Connect side sewer per Cily Standard #'s 601, 602, 604. �`J��Ij� G� lG /�0/a. ?�� �` ��� ��<<'�) <br />,/ <br />! 7. Connect all rooftop downspouts to the�eicle-ee+ae� C�:�cl� �<��. � i.� �� ,: ,;� �•� ( �� <br />8.� ConrLeckrooftop ow ou s a�thedrainag system�ra ided f r th ot. <br />9. Roo(top runoff must be discharged to a roof downspout infiltration syslem per City of Everett <br />Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br />attachment for more details. <br />10. The contractor must meet with lhe Public Works Inspecfor to discuss potentiai drainage <br />routing prior to beginning the project. <br />�%�1 L� Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />13. Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />1d. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City o( Everett Standard Plan :'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard �3Q7. <br />17. Pave ��riveway from the front property line out to the street psving. <br />1S. Contact the Water District for connectirg provisions for this building's <br />water and sewer services. <br />19 A catch basin as per City Standard Plan �102 with a gas trap per Stondard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this huilding in compliance with the requirements cf NFDA <br />S�andards 13D. <br />�;,�����,-:�„s zI2 <br />