My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5307 S 3RD AVE 2016-01-01 MF Import
>
Address Records
>
S 3RD AVE
>
5307
>
5307 S 3RD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 9:30:08 AM
Creation date
3/8/2017 1:27:01 AM
Metadata
Fields
Template:
Address Document
Street Name
S 3RD AVE
Street Number
5307
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM NORR ORDERS REPORT <br />Total-Utility Maintenance Management S}�stem <br />---__=====03_28-1995__________________ <br />Page 1 <br />---------------------------- --____________=____ <br />Date Range :01/09/1989 - 03/21/1995 <br />CM Work Order Range :1001091070001 - 8801086100085Pattern :7101196730093 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />_______________________________________________________________________________ <br />CM WORK ORDER ID: 7101196730093 Title: AFTER HOURS 5307 S. 3RD A V� <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WML0585F02 -- WATER MAIN LINE <br />?,ocation ID: -- <br />Program 710 Function 119 Activity 673 <br />Date Completed: 03/20/1995 <br />Overall Craft: <br />Issued: 03/20/1995 <br />out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />status: <br />Labor: <br />Craft ID <br />UL SWU <br />WST TDE1 <br />SUP1 WMW <br />Materials: <br />ID <br />CLAM42123647 <br />vehiclas: <br />ID <br />V2226 <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />STENSETH, WOB URT <br />TFIOMPSON, DWAYNE E. <br />WARD, MICHAEL W. <br />Description <br />CLAMP REPAIR 4" 4.77-5.57 STLS <br />Description <br />88 FORD DUMP 5 YARD <br />Planned Hrs Actual Hrs <br />0.00 4.00 <br />0.00 4.00 <br />0.00 4.00 <br />Cost <br />60.68 <br />65.40 <br />86.04 <br />Tota1 Labor Cost: 212.12 <br />Date # Used <br />03/19/1995 1 <br />Cost <br />77.66 <br />Total Material Cost: 77.66 <br />Hours Cost <br />4.00 43.20 <br />---------- <br />Total Vehicle Cost: 43.20 <br />Work Descrlption: <br />------------------------------------------------- <br />BIAWN COUPLING <br />Total cost for work order 7101196730093: 332.98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.