My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5506 S 3RD AVE 2016-01-01 MF Import
>
Address Records
>
S 3RD AVE
>
5506
>
5506 S 3RD AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 11:25:20 AM
Creation date
3/8/2017 1:30:56 AM
Metadata
Fields
Template:
Address Document
Street Name
S 3RD AVE
Street Number
5506
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TYPE OR PRINT ONLY <br />Applicaoon For <br />PUBLIC WORKS PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everetl, WA 98201 (425) 257-8810 <br />Dat� <br />Public Works Permit M <br />8-30-99 <br />euilding Pertnit H C9908-025 <br />Public Works Fee $ <br />Dina Sergeyev 5506 S 3rd Ave Everett 98203 425 303-0236 <br />Owner Mailing Adtlress City Zip Phone <br />AppGcant MailingAtltlicss City 2ip Phone <br />Describe Proposed Work adding living space to <br />PROJECTADDRESS (ii known) <br />Altach lour (4) copies plans for proposed work - Draw to scale and note the lollowing il applicable: <br />• Property Lines • Uutline and dimensions of all existing and proposed s�ructures on the lol • Ezisting and proposed utilities <br />• Centedine ot street • Indicate North • Show any proposed grading changes • Show measurements <br />DO NOT WRITE BELOW THIS LINE <br />PERMIT CONDITIONS: <br />1. All calls tor inspection shall be made 24 hours in advance - phone (425) 257-8810 <br />2. All work shall be periormed in accordance with this permit and current Ciry ot Everett Design and <br />Construction Standards and Specifications. <br />3. CaII Locatinn Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-B00-424-5555. <br />'Uo��r, voo aKs <br />I�GT � r4NNJa <br />I R tiv� <br />11'.. �_ � <br />�A7E.,.,_ q '' <br />_._ _..J. <br />pprove or onsrucion a e <br />FINAL INSPECTION <br />Appmved as Constructed <br />Date <br />W <br />� <br />Y• <br />ACKNOWLEDGEMENT OF CONDITIONS <br />Thc undersigned owner/applicant hereby agrees to hold antl save hartnless <br />the Ciry of Everett �rom any and all claims for damages, cosis, expenses, or <br />causes ol action Ihat may arise because ol installation and maintenance of tho <br />improvement or other right�ol-way uso hereto applied for aM further agrees to <br />remove same upon notice Irom the City and to replace publ�c property dam- <br />aged there6y. <br />igna ure o p ican a e <br />VJORK AUTHOfiIZED CY THIS PERMfT MUST BE SL1RfED 1NfT}iIN 180 DAYS OF DAlE PERMIT IS �SSUED AND 7}iEREAFfER IS TO BE qLIGENfLY PURSUED TO <br />COMPlET10N. TH:3 PERMR MAY BE CANCELLEp pY THE CfTY UPON ANY SlYWPAGE OF VJORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.