Laserfiche WebLink
'T` 1"�� <br />Date <br />Job Address: <br />Permit No: <br />Date of Pennit: <br />(some inspections, no final letter) <br />�-i�l�� s���l� <br />1 ,I�1 <br />/'t �'1 Q 5 <br />A review of our inspection record file reveals that the last inspection made <br />� �,57�(P . All permits <br />at the subject address was on <br />expire by limitation and become null and void if the building or work <br />authorized by permit is suspended or terminated at any time after the work is <br />commenced for a period of 180 days. The City of Everett Building Code <br />requires final inspection for all permits issued, and it is the responsibility <br />of the permit holder to call for the necessary inspectioos. <br />If work is continuing, please call for inspection within the next seven days; <br />or if work has been unavoidably delayed, request from us in writing an <br />extension of your permit (permits may be extended once for an additional 180 <br />days from date of issue). If yau do not contact us within seven days you may <br />second floorPe Servi ce Center dBuilding,113200 Cedarrt5treet;5 0�c call �us tat <br />259-8'45. <br />Your cooperation in this matter will be appreciated. <br />Sincerely, <br />ALFRED R. THEAL, P.E., <br />Public Works Director/City Engineer <br />BY: L.N. Callahan <br />Building Official <br />lNC/rtm <br />1623H <br />0925H for primary merge docu�nent <br />