My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4325 S 4TH AVE 2018-01-02 MF Import
>
Address Records
>
S 4TH AVE
>
4325
>
4325 S 4TH AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 2:03:04 PM
Creation date
3/8/2017 1:37:13 AM
Metadata
Fields
Template:
Address Document
Street Name
S 4TH AVE
Street Number
4325
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
InspectionType Date Result <br />4325 S 4TH AVE <br />Permit: C0712-002 Status: FINALED Issued: 1/7108 <br />Description: BEDROOM ADDITION <br />Notes/Conditions 206rac, rvsec, x lvswaQc <br />Footing 1/17/08 Approval <br />Foster <br />Remarks <br />Finaled:3/14/14 To Records: <br />Foundation <br />1/17i08 Approval See notes <br />Foster <br />Footing/foundation wall between house and garage, OK for concrete. <br />Underfloor <br />1/24/08 Approval <br />Huhta <br />ShearNailing <br />1128/08 Approval <br />Huhta <br />Letter 8121109 Reminder to call for Finals <br />McLeod <br />StatusReview 5/17109 Job appears complete, send letter <br />Huhta <br />Counter Visit 1/13/10 Approval Request for extension -see notes <br />Patterson Owner came in to request an exie,rsion-letter is in fle- he understands that should nothing progress <br />by 07/01/2010 that he may be charged additional fees or have to resubmit for brand new permit <br />Framing 2118110 Approval <br />Huhta <br />InsulBldg 2/18/10 Approval <br />Huhta <br />MechRoughln 2/18110 Approval <br />Pons <br />Subject to Plumbing & Mechanical ok <br />Subject to Plumbing & Mechanical ok <br />Will look at dryer duct at Final <br />PlbgRoughln 2,16110 Corr Reqd See notes <br />Walden Corrections: <br />1. Change 1 112 to 2 to laundry relief to go to ground for holwater tank <br />2. Complete mechanical- call for inspection <br />3. Dryer exhaust to be smoothe metal- no screws <br />PlbgRoughln 2/18/10 Approval <br />Pons <br />Final Bldg 7/2/10 Approval As per notes <br />Budden Final approved as noted: <br />011ain Plumbing Final Inspection approval <br />�. Obtain Electrical Final inspection approval- permit #E0707-081 <br />Final Mech 712/10 Approval As per notes <br />Walden Mechanical Final ok as noted: <br />1. Complete 2 straps on hotwater lank <br />2. Complete foam pad under howater lank <br />S:1MMcleodlCrystal\InspectionRecordsTemplalesllnspectionRecordsTemplatet 12/19/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.