My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5302 S 4TH AVE 2018-01-02 MF Import
>
Address Records
>
S 4TH AVE
>
5302
>
5302 S 4TH AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 2:32:44 PM
Creation date
3/8/2017 1:54:36 AM
Metadata
Fields
Template:
Address Document
Street Name
S 4TH AVE
Street Number
5302
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />CLOSED CM WORK ORDERS <br />REPORT <br />City of Everett Total Utility Maintenance <br />Management System <br />02/14/1994 <br />Page 1 <br />Date Range :O2/01/1992 - 02/14/1994 <br />CM Work Order Range :<Blank> - 8405421080229 <br />Pattern :7401196750766 <br />Item Range :<Blank> - WW22O2OOO1 <br />Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7401196750766 Title CONVERT 5302 GMIM+ 4TH AVE <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />>302 5 AVE <br />Item ID: WSO585CO22 -- WATER SERVICE <br />Location 1D: -- <br />Program 740 Function 119 <br />Activity 675 <br />Date Completed: 02/11/1994 <br />Overall Craft: <br />issued: 02/09/1994 Issued by: SKL <br />Assigned to: <br />Out of Service? NO Priority: Travel <br />Time: 0.00 fir. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name Planned Iirs Actual firs <br />__________ __________ <br />Cost <br />_____ ______ _________________________________________ <br />UL LMA LIDDING, MAURICE A. <br />0.00 3.00 <br />41.04 <br />WST WDT WALDEN, DAROLD T. <br />0.00 J.00 <br />54.96 <br />Total Labor Cost: <br />96.00 <br />Materials: <br />ID Description <br />Date # Used <br />________ ________ __________ <br />Cost <br />____________ ______________________________ <br />ADAP34OOO547 ADAPTER 3/4" MIP X INSTA-TITS@ <br />02/11/1994 4 <br />32.24 <br />BOX00OO56247 BOX METER PLA 15" X 10" W/LID <br />02/11/1994 1 <br />12.19 <br />COUP34OO4647 COUPLING 3/4" ANG MET X FIP @ <br />02/11/3.994 1 <br />3.31 <br />COUP34142747 COUPLING 3/4" CTS COMP X MIPT@ <br />02/11/1994 1 <br />5.20 <br />ELL0341O1447 ELL 3/4" 90 DEG BRASS <br />02/11/1994 1 <br />1.78 <br />ELL034104247 ELL 3/4" STREET BRASS <br />02/11/1994 1 <br />1.98 <br />METE36O89447 METER 5/e" * NO REMOTE READER <br />02/11/1994 1 <br />29.60 <br />PIPE34O6O647 PIPE 3/4" POLY I.P.S. <br />02/11/1994 3 <br />0.75 <br />VALV34OO8348 VALVE METER 3/4" LOCK WING IP@ <br />02/11/1994 1 <br />8.01 <br />Total Material Cost: <br />95.06 <br />Vehicles: <br />ID Description <br />Date Hours <br />________ ------ ---------- <br />Cost <br />____________ ______________________________ <br />V2146 SVC TRUCK CHEV 87 <br />02/11/1994 3.00 <br />15.60 <br />Total Vehicle Cost: <br />15.60 <br />Total cost for work order 7401196750766: <br />206.66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.